How to Pass a Prop Firm

Account phases, withdrawals and reference transitions

Keep evaluation completion, a new account phase and a cash movement separate instead of carrying one rule state forward without authority.

Added 14 October 2026

A new phase needs its own identity

An evaluation, later account arrangement and withdrawal review can have different terms and permissions. Record the exact account type, purchase vintage, phase and effective rule version rather than carry a brand-level summary across every transition.

The new curriculum treats phase identity as a source relationship, not a completed legal or administrative determination. The teaching calculators contain no private programme account. A successful arithmetic comparison in one synthetic phase cannot establish that another phase has opened, that its terms match or that an application has been approved.

A cash movement is not another trade

A deposit, credit, withdrawal, reset or transfer can alter account values without being trading P&L. The relevant programme can specify how such an event affects a reference, drawdown limit or reward basis. That source should control the interpretation.

The replay rejects nonzero external-flow rows rather than automatically adjusting a peak or counting the movement as profit. This is a deliberate scope boundary. It does not mean that real programmes never make account adjustments. A genuine ledger should retain the event and applicable transition separately, with the source version that explains how it affects the account state.

Do not assume a trailing floor resets or remains unchanged

A qualifying high-water reference can be carried, capped, reset or otherwise treated under the exact account terms. A generic trailing label cannot identify the transition. Preserve the reference before the event, the actual account adjustment and the source-defined reference afterward.

The packet's optional cap is an invented arithmetic convention within one uninterrupted exercise. It is not a withdrawal policy. Its next-floor field records the entered after-close update, not a new account issuance. A review that keeps these events distinct can ask a precise support question without inventing a favourable reset or asserting that a particular payout has occurred.

Approval and payment are different evidence requests

A dashboard objective, a completed evaluation, an approved account and an actual payment are distinct events. An observation of one does not supply the original records for the others. Keep private identity and billing documents off public examples.

This site introduces no new participant testimonials, payout timings or measured approval rates. The calculator exports preserve account approval and payout eligibility as null. A consumer comparison can still identify where a programme describes these stages and which terms apply. It should not promote a numerical exercise into empirical proof that a firm will approve or pay a reader.

Preserve the native trading policy during transition review

A new evaluation condition or reward objective does not silently authorise changes to the selected strategy's original entry and native exit identity. Document any separately authorised change with its version and effective time.

A phase review can concern eligibility, permissions and accounting while leaving the trading system unchanged. In particular, a session loss calculation is not a daily stop manager for a model governed by a minute execution policy. The new tools issue no trades or position changes. They make supplied rule mechanics inspectable without turning an administrative goal into a retrospective strategy modification.

Build a transition record

Save prior account identity, new phase identity, effective documents, cash movement, reference before and after, outstanding exposure and administrative status. Keep unanswered fields rather than infer them from a familiar programme name.

The useful conclusion is which transition can be reconstructed and which source is still required. Generic arithmetic can illustrate a mechanism but cannot settle an actual contractual state. No live monitor, paid capacity or automated publisher is created here. A genuine operational claim would require the current authoritative account route and durable cloud evidence beyond a locally calculated teaching export.

Reference documents

These references cover mechanisms and source definitions. The worked numbers on this page are invented teaching inputs, not provider or account records.

Worked evaluation records