How to Pass a Prop Firm

Profit targets, minimum days and separate stage conditions

Keep net profit, declared trading days, qualifying positive days and consistency as distinct arithmetic conditions.

Added 14 October 2026

A target is not the whole stage

An evaluation can have several conditions that do not become satisfied together automatically. A closed-profit target, a day count, a consistency ratio, loss constraints and permissions belong in separate fields. Completing one arithmetic comparison does not authenticate the others.

The new daily-objective ledger reports target, trading-day minimum, positive-day minimum and consistency independently. It intentionally does not check intraday loss paths, holding permission, identity review or programme approval. The public programme sources illustrate why the exact phase and account terms matter. No universal stage structure or promised pass method is inferred from the worksheet.

Use the closed-net convention explicitly

The teaching ledger accepts cost-inclusive closed daily results. It does not turn unrealised gains into completed profit or infer liquidation from a mark. Each day's supplied trade count is a separate input used for the exercise's trading-day count.

In the base packet, four days have nonzero declared trade counts and three days have positive net results. A fifth flat row has zero trades. Net profit reaches the entered 1,000 target exactly. Those facts can be reproduced from the fictional rows, but do not establish that any actual programme would count the same dates or classify a particular activity as an eligible day.

A positive day can have another minimum

A programme may define a qualifying positive day using a specified amount and operator. Do not assume that every slightly positive account day necessarily meets that condition. Record the criterion separately from the plain sign of the daily result.

The tool accepts an entered positive-day minimum and a separate equality choice, while requiring net result above zero for a positive day. An amount at the entered threshold can therefore be included or excluded according to the supplied operator. This is a teaching predicate, not an automatic implementation of a named programme. A real comparison needs its applicable definition and genuine daily accounting.

The same ledger can meet one objective and miss another

Under the base net-denominator case, target and day-count arithmetic meet their entered conditions, while the sixty-percent consistency share does not meet the entered fifty-percent threshold. The combined arithmetic flag is false. Switching to the supplied positive-day denominator changes the ratio condition without changing the rows.

A true combined flag in that variant still does not establish a pass. Intraday drawdown, account permissions, actual programme scope and administrative review remain unperformed. Keep those null fields visible. A clear per-condition output is more useful than a large green passed label that hides which questions were never evaluated.

Boundaries and ordering need source identity

A target reached exactly can meet an inclusive entered objective and not a strict one. The programme might also specify when the best day is finalised or whether positions must be closed. Save those definitions with the phase identity.

The daily ledger has no order stream or live account route. It cannot tell whether a close was requested, accepted or completed before an actual deadline. Its cost-inclusive closed-net premise is supplied. Do not use the tool to turn pending orders or a promising open mark into a certified completed result. Those events require their own account records and interpretation.

An objective checklist that stays honest

Keep a row for each condition with its source, entered interpretation, calculated field and remaining evidence. Preserve the loss-policy replay separately from the daily profit arithmetic. They can be linked to a common observation window without becoming interchangeable.

The packet provides synthetic rows to practise these distinctions, not a participant outcome study. Completing a checklist supports process review; it does not provide future acceptance probability or payout reliability. For a real stage decision, the relevant programme and authoritative account process must resolve all applicable conditions, not just the ones that a browser worksheet happened to calculate.

Reference documents

These references cover mechanisms and source definitions. The worked numbers on this page are invented teaching inputs, not provider or account records.

Worked evaluation records